The works were scheduled to be completed within one week. Using our on-site welders, we built the palisade fencing in-situ, carefully shaping it to follow the curved head of the bridge and adjoining sides.
To avoid placing stress on the bridge walls, the fencing was designed as a free-standing structure. Posts were chemically anchored into a concrete base that had been poured prior to our arrival, ensuring stability and strength. Once in place, the fencing provided a secure barrier while maintaining the bridge’s structural integrity.
The works were delivered efficiently and to a high standard. The new palisade fencing achieved complete security for the area beneath the bridge, with a durable resin floor-bolted framework that ensures long-term performance.